Typical structure
| Loan amount | $100,000 – $15,000,000, depending on the program |
|---|---|
| Leverage | Up to 90% of total cost for builders with a recent track record (typically 5+ completed projects in the last 12 months); lower for newer builders. Tested against both an LTC cap and a completed-value cap |
| Completed-value cap | Typically 70–75% of the as-completed appraised value |
| Term | 9–24 months, interest-only, extension options on most programs |
| Construction funds | Held in escrow, released in draws after inspection |
| Credit | Typically 660+ — but the minimum rises as experience falls. A first build usually needs 700–720+. |
| Experience | First-time builders are financeable with a general contractor who holds a current license. Completed builds move you up a leverage tier; they are not a yes-or-no gate. |
| Reserves | Expect a real reserve requirement — commonly a fixed cash figure or a percentage of the construction budget |
| Entity | LLC or corporation required by nearly every program |
Ranges across our lender panel — not an offer. Your terms depend on the lender, the lot, the budget and your track record.
Where this loan wins
Infill lots and spec builds
The single most common file we see: a lot you own or are buying, a set of plans, and a build budget. Different lenders treat spec inventory very differently — some discount your completed value hard, some do not. That is the part we shop for you.
You own the land already
Land you own with equity can often count as your contribution instead of cash. That is usually the difference between doing one build and doing three.
Multiple builds at once
If you are running two or three at a time, the structure changes — cross-collateral, portfolio programs, or separate loans. We will show you what each one does to your cash position.
A budget that survives underwriting
Most construction files get cut, not denied — the budget comes in soft and underwriting reduces the loan. We rebuild the budget with you first.
Recently funded
$1,061,875 — ground-up construction
A single-family build in Collier County, Florida. The lot and the construction budget on one loan, with the build released in draws against completed work.
$333,600 — ground-up construction
A small multifamily build in Lee County, Florida. The builder already owned the lot, so the land equity stood in for cash and the loan funded the vertical construction.
$354,703 — ground-up construction
A spec house in Lee County, Florida, on a lot the builder held free and clear. Closed as a refinance so the build budget came out in draws without new cash at closing.
$332,466 — ground-up construction
An infill lot purchase in Lee County, Florida, with the build budget attached to the same loan.
What we need to quote you
- Address or parcel number of the lot
- Purchase price (or what you paid, and when)
- Plans and a line-item construction budget — even a draft
- Your GC, or your own license if you are building it
- Ground-ups and flips completed in the last 36 months
- Estimated completed value and your exit: sell or refinance to a rental
From application to first draw
Pre-qualification
A 3-minute form or a 15-minute call. We tell you the honest range you can expect and what would kill the deal.
File and term sheets
We package the file the way underwriters want it and shop it across our lender panel instead of forcing it into one box.
You pick the term sheet
We walk you through rate, points, leverage and reserves side by side, and what each one actually costs you on this deal.
Appraisal, title, underwriting
We drive the third parties and chase the conditions so you can keep working on the project.
Closing
Typical closing is 21–30 days from a complete file. Construction and rehab dollars are then released in draws.
How draws actually work
This is where most builders get burned, so read it carefully. Construction money is not handed to you at closing — it sits in escrow and comes out in draws as work is completed. You submit the draw with invoices and photos, the lender orders an inspection, and the lender funds. We package and submit your draw and push it along, but the lender controls approval, inspection and funding timing. Any broker who promises you a funding date on a draw is telling you something they cannot control. What we can do is make sure your draw is complete and correct the first time, which is the actual reason draws come back slow.
If this is your first build, read this part
Most people assume no track record means no loan. That is not how these programs work. Experience is a tier, not a gate: it sets your leverage and your minimum credit score, not whether you get financed at all. The trade is real — a first-time builder typically comes in around 75–80% of cost instead of 90%, and needs a higher FICO, not a lower one, because the lender is pricing the risk somewhere. Here is the part almost nobody tells you: on several of our programs your general contractor’s experience counts toward yours and can move you up a tier, which is worth far more than shopping for a better rate. It is not automatic. The lender wants a signed AIA contract with the GC, roughly five completed projects of similar scope in the last 36 months, permits or contracts proving the GC was the contractor of record on those, a current license and a certificate of insurance. Bring us that package at pre-qualification and we will structure around it. Bring it at underwriting and it is usually too late to change your terms.
Have a lot and a set of plans?
Send it over. We will tell you the leverage range and where your budget is going to get questioned.
Before you apply
Your first ground-up build
What underwriting asks of you, what it asks of your GC, and how that decides your share of the cost.
Read the guideHow construction draws work
What the inspector checks on every draw, and the five things that hold a draw up.
Read the guideWhat a draw inspection actually checks
What the inspector measures, why delivered material funds nothing, and how to pass on the first visit.
Read the guideWhat underwriting reads in a schedule of values
How the line-item budget is built, which lines underwriting re-cuts, and why a vague allowance costs you loan dollars.
Read the guideWhat a change order has to say to get approved
What the lender needs on the document, where the money comes from, and why the cost is a draw cycle rather than a fee.
Read the guideWhat happens when a build runs out of budget
When the cost to finish passes the money left to draw: the deposit, the re-cut budget and the draws afterward.
Read the guideFlorida
Closing taxes, insurance and flood-zone rules that change a build budget.
Florida costs and rulesTexas
The appraisal reset after a purchase, the local tax stack and the coastal windstorm certificate.
Texas costs and rulesGeorgia
Lien waivers that become final on day 90, and the recording tax a construction note does not pay.
Georgia costs and rulesNorth Carolina
The lien agent every build of $40,000 or more has to name before the first contract.
North Carolina costs and rulesArizona
The 20-day preliminary notice that decides who can lien, and how a finished build gets a new taxable value.
Arizona costs and rulesOhio
The notice of commencement that has to be recorded before the first contract, and the 60-day lien window on a spec house.
Ohio costs and rulesOne Bridge Capital arranges business-purpose real estate financing through a panel of third-party lenders and is not a lender. Terms shown are typical ranges, vary by lender, property and borrower profile, and are not a commitment to lend. Loans are for business purposes only and are not available for owner-occupied primary residences.
Frequently asked
Our construction lenders cover 48 states plus Washington D.C. — everywhere except South Dakota and Vermont. We are based in Southwest Florida and build there ourselves, which is why we read a budget like a builder; that experience travels with the file regardless of where the lot is. Tell us where the lot is and we will tell you which lender fits it.
Yes, on several of our programs, with a general contractor who holds a current license and has a track record. Experience sets your tier, not your eligibility. Expect roughly 75–80% of cost instead of 90%, a higher credit score requirement rather than a lower one, and a harder look at your reserves and your budget. On some programs your GC's experience counts toward yours and moves you up a tier — ask us about that before you apply, not after.
On most programs, yes — land acquisition and construction are underwritten together against total cost. If you already own the lot, its equity often counts toward your required contribution.
Once submitted, a draw typically runs on an inspection cycle measured in days, not weeks — but the lender orders the inspection and funds it, not us. We package the draw, verify it against the approved budget and push it. The most common cause of a slow draw is an incomplete submission, and that part we control.
You either sell or you refinance into long-term financing. If you plan to hold it as a rental, tell us at the start — we can line the construction loan up so the DSCR takeout is clean instead of a scramble at month 11.